Research and Competitions
New Construction
In Progress
Revitalization

The new life of Zapochainye

2019. Russia, Nizhny Novgorod, Zapochainye

The new life of Zapochainye

Valuable objects of Zapochainye

Valuable objects of Zapochainye
Master plan of territory development
Proposal for development of the historical environment
Development
transportation
transportation system
Creation of a unified information system
system for project
Development
Investment concept of territory development
The new life of Zapochainye

Comparison of historical parcellation and existing cadastral surveying

Valuable objects of Zapochainye
Comparison of historical parcellation and existing cadastral surveying

An example of a methodology for working with the territory

An example of a methodology for working with the territory

A methodology for the regeneration of the area

On example of the section of Ilinskaya str.

On example of the section of Ilinskaya str.
A methodology for the regeneration of the area

Construction modes:

Restoration

Reconstruction

Construction modes
Sanation

New construction

Construction modes

Territorial resource

Frame
Construction modes

Scheme of the proposed street and road network in the Zapochainye territory

Scheme of the proposed street and road network in the Zapochainye territory
Total area of the territory 175 ha
Extent of proposed works 18 075 m
Length of proposed sidewalks 36 150 m
Proposed pedestrian and public spaces 35 ha
Length of proposed bicycle lanes 13 km
Improvement of green spaces 22 ha
Including slope stabilization 16 ha

Main street profiles

Main street profiles

Master Plan

Master Plan

Urban Development Support Information System

Urban Development Support Information System
Urban Development Support Information System
Urban Development Support Information System

Ilyinskaya Street. Pochayinsky ravine

Ilyinskaya Street. Pochayinsky ravine
Ilyinskaya Street. «Gateway to Zapochainye»

Ilyinskaya Street. «Gateway to Zapochainye»

Pochayinsky ravine street. Tolkuchy market

Pochayinsky ravine street. Tolkuchy market
Gogol Street

Gogol Street

Pochainsky ravine

Pochainsky ravine

Infrastructure project implementation order

Infrastructure project implementation order
I Place 2020-2021, 2,22 bln 
II Place 2022, 0,80 bln 
III Place 2023-2024, 2,75 bln 
IV Place 2024-2025, 2,40 bln 
Total public investments: 8,17 bln ₽
Private investment: 31,4 bln ₽