Current situation. View of the property from Oktyabrskaya Street.
Current situation. View of the site from the Oka River embankment
Current situation. View of the object from the Cathedral of Saints Peter and Paul
- Improving the quality of tourist infrastructure by creating a better urban environment that attracts affluent tourists
- Developing pedestrian activity in the city by expanding the pedestrian zone and creating park-and-ride facilities at the entrance to the city center
- Creating a unified design code for signs, outdoor advertising, shop windows, fences, lighting elements, small architectural forms, and landscaping elements
- Restoring the historical role of the central Lenin Square as a focal point for urban functions
- Creating spaces for creative and commercial activities by activating unused buildings and urban spaces
Lenin Square is the main square and the historical, conceptual, and geometric center of the old city. It is anchored by the cathedral bell tower and framed by historic merchant houses, shopping arcades, and government buildings. Historically, the square has been used for fairs, processions, celebrations, festivities, gatherings, and other large public events.
Development of a section of the Tarusa City Center Master Plan entitled "The Historic City Center Area and Its Development Concept, with Visualization of the External Architectural Appearance and Urban Environment."
The transformation of these territories and the connections between them is one of the main goals of the project.
Restoration of the preserved wall of the public bathhouse building. Regeneration of the site while preserving its historical function. Construction of new facilities with public functions within the framework of the merchant estate morphotype with outbuildings. Construction of wooden galleries and parking lots. Creation of a new pedestrian connection along the MOSKh building. Opening of access to the site through the terrace of the Dymov restaurant.
The actions planned for the first stage will create momentum for the development of the entire complex project.
Within the boundaries of the design areas, it is also mandatory to replace discordant signs and advertisements, standardize fences with priority given to visually transparent ones, and repair building facades to restore their historical appearance.
Organization of a safe and barrier-free pedestrian environment with measures to reduce and slow down traffic. Replacement of paving with cobblestones and raised pedestrian crossings with safety islands. Organization of a roundabout at the intersection of Karl Liebknecht Street and Lunacharsky Street. Replacement of public transport stop pavilions. Scattered green parking spaces in pockets. Bringing street profiles into line with the design code. Planting trees and flower beds. Organization of storm drainage, street and architectural lighting. Landscaping and bringing the territory into line with the design code.
Technical and economic indicators:
6. Development area: entrance gate.
Restoration of historic buildings, uncovering original openings. Revival of the commercial function of the ground floors. Activation of courtyard facades by creating entrances and display windows. Activation of the basements of merchant houses by recreating cellars. Adaptation of modern buildings to the historic context. Demolition of non-capital, discordant objects. Construction of an amphitheater and street café in the courtyard of the fire station.
5. Relocation of the fire station and police station. Opening of courtyard areas as public spaces.
Creation of a square in front of the administration building and a service parking lot. Adaptation of modern development in a historical context.
4. Construction of a new art gallery building as part of the recreation of the 1777 master plan and reconstruction of the bus station and the square in front of it.
The project envisages the following measures in the second stage:
3. Improving and bringing all street spaces in the city into compliance with the design code
Restoration of historic buildings, uncovering original openings. Revival of the commercial function of the ground floors. Activation of courtyard facades by creating entrances and shop windows. Activation of the basements of merchant houses by recreating cellars. Adaptation of modern buildings to the historic context. Demolition of non-capital, discordant objects. Installation of brick paving to support the absence of finishing on courtyard facades. Reconstruction of garages and outbuildings to adapt them for public functions. Opening of courtyard areas of residential buildings, creation of public gardens and vegetable gardens. Improvement and bringing the territory into compliance with the design code.
2. Improvement of courtyard areas on Lenin Street
Improvement of Lenin Square, the historical, conceptual, and geometric center of the city. Restoration of merchant houses, estates, and shopping arcades, revealing the original openings. Resumption of the commercial function of the first floors of merchant houses and estates. Adaptation of modern buildings to the historical context. Demolition of non-capital, discordant objects. Return of the isolated territory to the dominant feature of the square — St. Peter and Paul Cathedral. Recreation of the fence and temple benches. Organization of a fairground with a canopy in the courtyard of the administration building, reconstruction of garages and outbuildings. Combining the square and the roadway into a single level. Improvement and bringing into compliance with the design code of the square.
1. Improvement of Lenin Square
The project envisages the following measures in the first stage:
The entrance gate is an empty plot on the site of a destroyed city bathhouse. It is located on the entrance road from Moscow and welcomes all visitors to the city. In addition, the site serves as the foreground of the city ensemble, dominated by the cathedral bell tower.
Development area: entrance gate
Courtyard areas are an untapped spatial resource in the city center, forming an integral part of valuable historical morphotypes and an important component of the city’s image.
Lenin Square
To initiate this process, the first step is to activate the impulse territories. By activating these territories, we define the scope of the necessary transformations for the future (within the boundaries of the historic center of Tarusa). These territories were identified during the research process as the most relevant for transformation.
Along with its great potential, the city undoubtedly has problems that need to be solved step by step as part of a comprehensive project.
Ancient history, unique architectural sites, picturesque landscapes, a comprehensive ensemble of historic buildings, Catherine’s 18th-century master plan—these and many other features are invaluable resources. At the same time, the city is unfairly underrepresented in domestic and foreign tourist clusters, and the history and cultural heritage of Tarusa are not properly highlighted in the urban environment.
The city of Tarusa has great potential for development.
To the Master Plan for the City Center of Tarusa, "The Territory of the Historic City Center and the Concept for Its Development, with Visualization of the External Architectural Appearance and Urban Environment"
Tarusa. Master plan.
2023. Russia, Tarusa
Administration of the urban settlement “City of Tarusa”
Paving of the pedestrian zone
Conclusions from the study
- Unregulated parking in the city center
- Poor quality of the street and road network
- Inefficient use of land
- Within the city center
- Haphazard approach to the design of public spaces (signs, landscaping elements, outdoor power lines)
- Violations of the historical structure of streets and squares, valuable buildings
- 89% of valuable buildings do not have protected status
- Lack of land surveying and information on the form of ownership of part of the territory
- Untapped socio-economic potential and inefficient use of valuable buildings
- Threat of losing valuable urban infrastructure
- Valuable infrastructure is not protected from unauthorized actions by owners
- Degradation of existing green areas
- Reduction in the area of pedestrian zones due to the worsening problem of illegal parking
- Decline in the visual quality of the urban environment due to a haphazard approach to shaping its visual appearance
- Preserved valuable framework structures
- Historical street tracing
- Picturesque views of the Oka River, preserved natural landscape of the embankment
- A developed green framework for the city
- High level of activity within the local community
- A variety of creative initiatives and festivals
View of the fire station courtyard
Section 1. Cathedral Square
View of the bus station building
View of the courtyard behind the administration building from the residential building
View of the planned art gallery and the square in front of the administration building
View of St. Peter and Paul Cathedral from the shopping arcade
Functional zoning diagram
Transformation and improvement plan
Development value scheme
Identification of areas with high growth potential
Identifying resources for transformation
View of the courtyard facades on Lenin Street
Section 2. Courtyard areas
Functional zoning diagram
Transformation and improvement plan
View of courtyard spaces from Karl Liebknecht Street
View from the entrance to the city. Bathhouse building
Functional zoning diagram
Transformation and improvement plan
- when determining limit parameters;
- when specifying requirements for the spatial characteristics of buildings
- When establishing zone boundaries according to typology;
- When establishing urban planning regulations, including:
Land use and development regulations
Can be used when updating urban planning documentation:
This section of the master plan includes proposals for the visual appearance of the architectural environment of the city center.
Proposals for preserving the visual appearance of the architectural environment of the city center
- Establishing zones taking into account the zoning master plan proposed in this section;
- Establishing zones taking into account the analysis of building morphotypes;
When determining the city's spatial development strategy, including:
- When developing recommendations on lighting, landscaping, paving, greening, placement of signs on building facades, and color schemes;
- When establishing areas of application for the design code, taking into account the typology of building types;
When updating the consolidated rules for improvement
- When establishing a protected site
- When establishing the boundaries of a landmark
Boundaries of a place of interest
- When approving projects for construction, reconstruction, restoration
- Development and placement of advertising and navigation
- Development of improvement projects
- When participating in competitions for grants
Can be used in project development and for evaluating existing projects:
Outdoor advertising elements
1. Rules for placing outdoor advertising signs depend on the building type.
2. The use of certain types of signs is not permitted in certain building types.
Prohibitions on placing outdoor advertising signs
Outdoor advertising elements
Color scheme regulations
Application of design code. Oktyabrskaya Street
Application of design code. Rosa Luxemburg Street
Application of design code. Lenin Street
Application of design code. Komsomolskaya Street
Application of design code. Oktyabrskaya Street
Morphological classification of buildings
Small architectural forms
Street cross-sections
Morphological typology of space
Sequential implementation diagram
Transportation and pedestrian scheme
at the address: 4 Lenin Street, Tarusa, Kaluga Region, 249100
Concept for the reconstruction of the building’s facades
Project proposal. View of the property from Oktyabrskaya Street.
Photo construction was-became
Side facade from the administration building
Rear facade from the inner courtyard
Side facade facing Oktyabrskaya Street
Main facade facing Lenin Street
Project proposal. View of the site from the Oka River embankment
Project proposal. View of the object from the Cathedral of Saints Peter and Paul
Rear facade from the inner courtyard
Side facade from the administration building
Side facade facing Oktyabrskaya Street
Main facade facing Lenin Street